Slurry seal work is scheduled on Saturday 3/23 and Saturday 3/30 on Via Rocas and the portion of Via Colinas between Via Rocas and Lindero Canyon Road. Grinding and paving on Russell Ranch Road is scheduled 3/25 through 3/29. Slurry seal work for ...
Slurry seal work is scheduled on Saturday 3/23 and Saturday 3/30 on Via Rocas and the portion of Via Colinas between Via Rocas and Lindero Canyon Road. Grinding and paving on Russell Ranch Road is scheduled 3/25 through 3/29. Slurry seal work for Canterhill, Glenbridge and Ridgeford Drive (Westlake Trails neighborhood) will occur in early April. All scheduled work is pending fair weather conditions.